DIN DIN EN 16907-3 [EN]

DIN EN 16907-3 PDF Download

Standard EN Sample
EN DE
DIN EN 16907-3 Sample

Earthworks - Part 3: Construction procedures

SKU167748264 Published by Deutsches Institut für Normung DIN Publication Date2019-04 Pages CountPages87

The DIN EN 16907-3 standard provides guidelines and procedures for the execution of earthworks during the construction of earth-structures. It covers the processes of excavating, transporting, and placing soils and rocks for the construction work. The standard also offers guidance for working with rock materials underwater. However, it does not cover the dredging of soils and the hydraulic placement of fills, which are addressed in other standards.

The execution of earthworks outlined in the standard is based on the conclusions of the earthworks design and optimization phase, as specified in EN 16907-1. This design phase takes into account the specific characteristics of the soil and rock materials and ensures their suitability for the construction work. If unforeseen events occur during the execution of the works, additional design work is performed to address these circumstances.

Details
DescriptorsClassification, Compacting, Construction, Definitions, Design, Earthworks, Excavation, Land retention works, Materials, Planning, Procedures, Refilling, Rocks, Soils, Transport, Bottom, Compressing, Methods, Ground, Processes, Floors
ICS Codes93.020 - Earthworks. Excavations. Foundation construction. Underground works
Language(s)English
File Size4.1 MB
Purchase Right after completing the purchase process, you will immediately get a digital copy of this standard which is: Not Locked Printable Multi-User $ 56.00

Related Documents: